Blog 2: Project ‘ATN South Carolina’

Published at:
Blog 2: Project ‘ATN South Carolina’

The two machines that we are making for our client are under construction. We are very busy to get the two machines finished before the deadline.

Last week (week 21) our customers from America came to the Netherlands to check on the progress of the machines. I also made a few pictures of the machines. You can see the pictures below. As you can see the machines are almost complete, but we still have a lot of work to do. 

We also demonstrated with the BK1 machine how we drain a refrigerator for our customers, they were very pleased and excited to see how it is done. 

blog_related

ATN Engineering installed two small degassing machines in Colombia.

ATN Engineering installed two small degassing machines in Colombia.
 Within one week two degassing machines for the draining of oil and refrigerant from refrigerators where installed in Columbia South America. A t…

Tilting table

Tilting table
Under construction for a Spanish customer we have a degassing machine and two tilting tables. The tilting tables are enabling the operators of positio…

Several machines under construction

Several machines under construction
The production at the ATN plant in Holland is running flat-out. Several machines, for customers all over the world, are under construction at this mom…